Our Playroom Design Process: Six Steps from First Call to First Play

One team carries your project from the first call through design, engineering, New York fabrication, and installation.

A custom playroom has to work on paper, in the room, and on opening day. We guide multifamily owners, play-café operators, schools, designers, architects, and larger residential clients through each decision before work reaches the site. The full path is 5–6 months from first call to first play.

Book a Discovery Call

The finished Kidz PlayZone: a yellow playhouse with a striped awning and arched openings lettered 546 Atlantic, between a coral facade, the green Vet Clinic and a cream storefront
Kidz PlayZone · Indoor playground · Finished space

Six stages from design agreement to installation

After a 30-minute discovery call, we’ll have a better understanding of your space, who will use it, your goals, and whether the project is a fit. We’ll discuss scope, budget, and timeline before outlining the next step.

A Kidandcad designer stays connected as your project moves through design, engineering, fabrication, and installation.

Design rendering of the Residence in Blue play kitchen: a light-framed arch around a blue patterned backsplash, open shelves, blue cabinets and a glass-front cupboard
The same Residence in Blue play kitchen, built and installed: the lit arch, blue patterned backsplash, monogrammed oven door and glass-front cupboard
Residence in Blue · 3D rendering and finished space
  1. 01.

    Design Agreement

    If the project is a fit, we’ll send a written proposal outlining the design scope, timeline, and fee. Once you sign, design begins.

  2. 02.

    Space Planning

    We map out the room’s layout, flow, and function. Bubble plans, sightlines, and traffic flow help shape the room before we move into detailed renderings.

  3. 03.

    3D Renderings & Itemized Contract

    We create 3D renderings and a video walkthrough so you can review the design before it moves to engineering. Two rounds of revisions are included. Once you approve the design, we prepare a contract with the project scope and itemized pricing for you to review before anything is ordered.

  1. 04.

    Shop Drawings

    We prepare shop drawings, material specifications, and structural calculations where needed. We work with your code consultant and provide engineering documents for project review. Your general contractor handles permitting.

  2. 05.

    Fabrication

    Our Maybrook, New York team CNC-cuts, frames, paints, and upholsters each component in our 15,000-square-foot factory. Your designer stays connected with the shop team as they check details and finishes against the approved plan.

  3. 06.

    Installation

    We coordinate shipping and the on-site crew, protect the work area, and install our scope. Then we walk through the finished room with you and address the punch list.

Book a Discovery Call

A Kidandcad team member checks a drawing against a scale model of a playhouse build at the Maybrook, New York factory
A Kidandcad fabricator smoothing a sheet of upholstery material across a workbench beside a curved foam edge piece
Maybrook, New York factory · Plan checks and upholstery

Materials and engineering for the space

Material choices are part of the design. We use glulam beams and structural connectors, with factory-applied finishes designed to be easily repaired. We serial-number components so our team can identify a part if it needs attention later.

Our process brings the design, engineering, and build details together before fabrication. We work with your project team on the technical requirements and provide documentation for review.

A Kidandcad fabricator handling a stack of factory-finished green panels at the Maybrook, New York factory
Maybrook factory · Factory-applied finishes
  • 01.It’s stronger. Glulam can carry greater loads than dimensional lumber of the same size while staying stiffer. That strength can help create open play areas with fewer support posts.
  • 02.It resists warping. Glulam is kiln-dried before lamination, which helps limit movement as it adjusts to indoor conditions. More stable beams can help protect fasteners, joints, and finishes over time.
  • 03.It spans farther. Glulam can span longer distances than dimensional lumber under comparable loads. Fewer support posts mean more open floor and clearer sightlines.
  • 04.It takes a clean finish. Glulam laminations are selected to reduce knots and surface defects, giving paint a smoother, more consistent base.
  • 05.Built for fewer repairs. We choose glulam for its stability and pair it with repairable finishes. That can help limit movement-related issues and make future maintenance easier.

First-Rate Materials That Last.

Projects built for different settings

Our selected work includes J Play Cafe, a 1,600-square-foot storybook play café with sculpted stone archways, a ball pit, and an imaginative play market; Enchanted Place, a 7,000-square-foot indoor play space blending a magical woodland with Scandinavian design; and Magical Forest, a 1,000-square-foot fairytale play café beneath a mushroom canopy. Explore selected projects and commercial spaces.

Design rendering of J Play Cafe: a sculpted stone archway with a slide, a storybook cottage with a green roof and a white ball pit by tall windows
J Play Cafe · Play café · Design rendering
Design rendering of Enchanted Place: pale slatted timber trees forming a woodland archway and a little arched house
Enchanted Place · Design rendering
Design rendering of Magical Forest: an orange mushroom-capped playhouse with an arched doorway beside a sunlit play café
Magical Forest · Design rendering

Questions about the process

How long does the process take?

Plan on 5–6 months from the first call to first play. We include the project timeline in the written proposal.

What happens during the first call?

The 30–45-minute call is a working conversation about your space, the people who will use it, your goals, and project fit. We also discuss scope, budget, and timeline.

What will I review before fabrication?

You’ll review floor plans, full 3D renderings, and a video walkthrough during design. Two revision rounds are included before the project moves to engineering and fabrication.

Who handles code review and permits?

Your general contractor handles permitting. We work with your code consultant and provide shop drawings, material specifications, and engineering documentation for project review. Final requirements depend on the project and its jurisdiction.

Can our architect, designer, or general contractor stay involved?

Yes. Your design team can collaborate with us through design and shop drawings. Your general contractor manages the site, schedule, and permitting while we coordinate our delivery, installation, and finish work.

What project budget should I plan for?

Custom projects start at $50,000. The scope and investment depend on the space and the features you choose, which we discuss during the discovery call.

Do you install outside New York?

Yes. We ship nationwide, and our crew travels for installation. We coordinate with your on-site team as the project moves toward install.

Start with the space you have in mind

Tell us about the space, who will use it, and your opening date. We’ll discuss fit, scope, and next steps on a discovery call.