Commercial rooms typically begin in the low six figures and scale with square footage, structural complexity, and finish level. We share comparable project budgets on the intake call.
What's the timeline from contract to install?
Plan on roughly five to six months from signed contract to a finished, occupied room — including design, engineering, fabrication, and a typical two-week install window.
Do you ship and install nationally?
We ship anywhere in the world a container can reach. Our crew travels for install, and we partner with your on-site team for assembly labor. Domestic, international, coastal, inland. If you can get a shipping container to it, we can build there.
Can you work with our architect or interior designer?
Yes — much of our residential work is collaborative. We integrate with the design team's drawings, finishes, and lighting plan.
How is your work different from imported playground equipment?
Imported equipment is catalog spec, plastic heavy, and not designed for the room around it. We design site-specific architectural play environments in wood — closer to millwork than to playground gear.
What materials do you use, and why?
CARB Phase 2 birch plywood, low-VOC water-based finishes, certified high-density foams, and architectural-grade hardware. Safer to be around, and built to be repaired rather than replaced.
Do you handle permitting and code compliance?
We support your team on ASTM F1487, ADA, and local building/fire code requirements, and provide engineered shop drawings.